Manufacturing & R&D
The stages
Six stages from drawing to carton
Every order passes through the same six stages, whether it is a catalogue model or a developed one. What changes is how much has to be settled at each stage before the next one can start.
-
01
Engineering & drawing review
The cavity, the fixing, the cable route and any part already on site are read against the model before anything is quoted.
-
02
Tooling & prototyping
A change inside the existing platform needs no new mould. Where a housing or a lens has to be new, a prototype is checked before tooling is cut.
-
03
Assembly
Fixtures are built to the approved sample and specification, with the driver, sensor and connector set for the order.
-
04
Ageing & testing
A powered run from the batch is left on for the period agreed for the model, then checked again for output, colour and switching.
-
05
Quality control
In-process and finished-goods checks follow the specification, and a fault is corrected before the batch reaches packing.
-
06
Export packing
Goods are packed to the instruction agreed for the order, labelled for the channel they are sold through and listed on the packing list.
Engineering
The drawing decides more than the price
Most of what goes wrong in a lighting order is decided before production, in a cavity that was never measured or a connector nobody mentioned. The review exists to find those points early.
- The series or the fitting you are trying to match.
- A drawing or a photo of the cavity, the shelf or the case, with the fixing depth.
- Where the cable can run, and whether a driver can be housed inside the furniture.
- The driver, sensor or connector already on site, if the new light has to join it.
- The destination market, so voltage and plug are set for it.
- The quantity per model, and how the order splits across lengths or finishes.
Tooling, prototypes & assembly
What is built, and in what order
A request either stays inside the platform that already exists or it needs something new. Which one it is decides the sequence, the sample and the share of the price that is tooling.
-
Tooling only when the model is new
A change inside the existing platform — size, colour temperature, output, sensing, cable, plug, logo or packaging — needs no mould. When a housing, a lens or an end cap has to be new, tooling is quoted as its own line.
-
A prototype before the mould
Appearance and structure are printed and checked first, so the form is settled on a prototype rather than on a mould that has already been cut.
-
Assembly to the specification
Each order is assembled to the specification for its model: driver set for the destination, sensor set for the trigger, cable and plug to the drawing.
Tooling cost, tooling lead time and prototype quantity are quoted per project. They are not stated here as a general figure, because they depend on the part being made.
Ageing, testing & control
Five checks before the carton closes
Each check answers a different question, and each is recorded against the specification for the model being supplied. A batch that fails one is corrected before it moves on.
- Incoming parts
- Housings, boards, drivers, sensors and cables are checked against the sample and the specification before they enter an order.
- In process
- Each station checks what it has just assembled: connection, seating, cable length, colour temperature set and switch function.
- Ageing
- A powered run of the batch is left on for the period agreed for the model, then re-checked; a unit that drifts is taken out of the batch.
- Finished goods
- Finished units are compared with the approved sample: output, colour, sensing, finish and marking.
- Packing
- Carton, inner packing, label and quantity are checked as the order is boxed, and again against the packing list.
The inspection chain and what a report covers Sample and written specification
Export packing
The last stage is the one the goods arrive in
Packing is specified with the order rather than after it, because a carton is the only part of the specification the customer sees before the light is switched on.
-
01
Cartons built for the route
Inner packing, carton grade and pallet arrangement are agreed per order, because a parcel to a store and a pallet to a furniture factory are not packed the same way.
-
02
Labels and manuals to your files
On OEM and private-label orders the label, manual and carton artwork come from your files and are confirmed in the approved sample.
-
03
Documents with the shipment
The packing list, the commercial documents and the freight papers agreed for the order travel with the goods, and copies are sent before they leave.
Where this leads
Send the part that has to fit
A drawing, a photo of the cavity or the driver already on site settles more of the review than a product name does. What comes back is the matching model, the points that have to change, and whether the change stays inside the platform or becomes a development.
Standard, customized, OEM or ODM The product range About the company
Capacity, line count, staff numbers and the size of the factory are confirmed at inquiry rather than published as figures here. What is described on this page is the process, not a measurement of it.
Next step
Ask whether the change needs tooling
Send the model and the points you want changed. The answer says whether it stays a light customization or becomes a development with a sample and tooling.