Company
Our Process
Before the order
Five stages from the first message to an agreed specification
The first half of the sequence turns a short brief into a document both sides can work from. Nothing is produced until that document and, on customized orders, a sample are approved.
-
01
Inquiry
The product or the fitting, the quantity, the destination and the points that cannot change.
-
02
Questions
Where the brief is short, the missing points are asked before a price is given: cavity, fixing, cable route and market.
-
03
Quotation
Price, lead time, sample terms and delivery basis, in writing.
-
04
Sample
A physical sample on customized and developed orders, approved by you before volume starts.
-
05
Specification approval
One written specification per model, agreed by both sides. It is the document production is checked against.
After the order
Five stages from production to the next order
Production is the part that follows the documents rather than the conversation. The stages after it are the ones that decide whether a second order is a short message.
-
06
Production
Built against the approved sample and specification, with the driver, sensor and plug set for the destination.
-
07
Inspection
The four checks on the finished batch, and the documents for the models that were shipped.
-
08
Balance & shipment
The balance is settled on the terms stated in the quotation, then the goods are packed and released.
-
09
Delivery
Export packing and the freight documents agreed for the order travel with the goods.
-
10
Repeat order
The approved sample and the specification are kept, so a second order starts from the document rather than from the beginning.
How the sample and the specification are agreed The inspection chain Packing and delivery
Who supplies what
Each stage has an input and a return
An order moves on the documents, not on goodwill. This is what we need from you at each stage, and what comes back with it.
| Stage | You supply | We return |
|---|---|---|
| Inquiry | The model or fitting, quantity, destination. | Open questions, or a quotation. |
| Quotation | Quantity, delivery basis, sample wanted. | Price, lead time, sample and delivery terms. |
| Sample | A decision on the sample, in writing. | The sample, and what it had to prove. |
| Specification | Corrections, if anything is wrong. | One written specification per model. |
| Production | Any open question, before assembly. | Goods built to the approved sample. |
| Inspection | A point to check before packing. | Result and documents for the models shipped. |
| Shipment | The balance on the terms quoted. | Packing list, freight papers and tracking. |
Sample terms, payment terms and the delivery basis are written into the quotation for the order, because they change with the model, the quantity and the destination.
Change during the sequence
Where a change still costs one thing instead of the other
An order can change at any point. What changes with it is the work behind the change, and that is what decides whether it is a message or a new sample.
- Before the quotation
- Model, quantity, finish, packing and destination can all still change, because nothing has been costed or built yet.
- After the sample
- A change means the sample is remade and approved again, and the schedule moves with it.
- After the specification is approved
- The change is written as an amendment and checked against the approved sample before production continues.
Where it slows down
Three things that send an order backwards
Most of the sequence is waiting on documents rather than on machines. These three are the ones that pull a sample or a specification back to an earlier stage.
-
01
A cavity that was not measured
An opening nobody measured, or a fixing depth nobody checked, sends the review back to engineering and moves the sample with it.
-
02
A part that was not mentioned
A connector, driver or switch already on site changes the model. Naming it at inquiry keeps it out of the sample stage.
-
03
A market that was not confirmed
Voltage, plug and the applicable documents follow the destination, so confirming it late can change the sample itself.
Where this leads
The first message decides most of the sequence
A model, a quantity and a destination are enough to start. The more of the installation you can name — the cavity, the fixing, the part already on site — the fewer stages have to come back.
Why work with us About the company The product range
Lead times are not published as a general figure. The time a stage takes depends on the model, the quantity and the destination, and is stated in the quotation for the order.
Next step
Start the first stage
Send the model, the quantity and the destination. Add a drawing or a photo if the lighting has to fit something already built.